Throughout the 8 day period beginning on December 31, 2024, crossjoin.co.uk's operability was checked 3 times. Crossjoin.co.uk was functional 3 times from the aggregate tests performed, last operable January 3, 2025, and replying with 200 status code. No downtime incidents were noted for crossjoin.co.uk in inspections performed as of January 8, 2025. All responses confirm that, as of January 8, 2025, there were no error statuses detected. Compared to 0.070 seconds average, crossjoin.co.uk responded in 0.069 seconds on January 3, 2025.