A total of 2 availability checks of jewelconstructionny.com were performed during the 700 day period starting from December 26, 2022. With a 200 status code response, jewelconstructionny.com was accessible 2 times, the last instance being on December 26, 2022, throughout the total checks conducted. As of November 25, 2024, all inspections conducted had found no instances of jewelconstructionny.com's non-functionality. No error status code was returned as of November 25, 2024, based on all the responses received. Noted on December 26, 2022, was jewelconstructionny.com's 5.488 seconds response time, against a 2.744 seconds average.